全国高端外围经纪人预约团队 _包小妹私人电话号码_300元两小时做完付款快餐_空降24小时服务免费微信

RETURN

PERFO

JCC Yantai Guoxing Relocation Project

 

 

lance of converting furnace

EPC project, 180kt/a copper cathode, SBF+MTC. Project investment: 2.2 billion CNY.
1000kt/a sulfuric acid, "non-equilibrium" high-concentration offgas-based acid production technology.

EPC project, 180kt/a copper cathode, SBF+MTC. Project investment: 2.2 billion CNY.
1000kt/a sulfuric acid, "non-equilibrium" high-concentration offgas-based acid production technology.

-->