全国高端外围经纪人预约团队 _包小妹私人电话号码_300元两小时做完付款快餐_空降24小时服务免费微信

RETURN

PERFO

900 KTPA AMIN Captive Copper Smelter Project, PT. Amman Mineral Industri (AMIN), Indonesia

 

Throughput capacity: 900kt/a copper concentrate, by-product: 815kt/a sulfuric acid.
World-class mining company, owner of the second largest copper and gold mine in Indonesia -  Batu Hijau Copper Mine.